Updated · 8 min read
In short
- Order the net floor area + 7% (straight layout) or 10–12% (diagonal, many corners), rounded up to whole packs.
- The subfloor decides the result: it must be flat, dry and firm — the tolerances are in the manufacturer's fitting instructions.
- Add underlay, a vapour barrier on mineral floors, skirting and transition strips to the shopping list.
Measure and order
Measure each room separately, including alcoves and the space inside door frames where the floor continues. Multiply length × width, add the alcoves, and subtract only what is permanently built in.
Then add the cutting waste: around 7% for a straight layout in a regular room, 10–12% for diagonal layouts, rooms with many corners or very short rows. Divide by the coverage per pack and round up. Buying one spare pack from the same batch is worthwhile — it makes a future repair invisible.
Check the subfloor
Floating floors are forgiving, but not of everything. Before ordering, check three things:
- Flatness: lay a long straightedge (2 m) in several directions. Most manufacturers allow only a few millimetres of deviation over 1–2 m; high spots are ground off, hollows filled with levelling compound.
- Moisture: new screed must be dry. In some countries, moisture is measured with the calcium carbide (CM) method; the maximum values depend on the screed type and the flooring.
- Firmness: creaking or flexing wooden floorboards should be screwed down or overlaid with boards before the new floor goes on.
Underlay and vapour barrier
The underlay evens out small irregularities and reduces footstep noise. Some floors have it pre-attached; adding a second one usually voids the warranty.
On concrete, screed or any mineral substrate, a vapour barrier (typically a PE film with overlapped and taped joints, or an underlay with integrated barrier) protects the floor from residual moisture rising from below. Over underfloor heating, choose a flooring and underlay approved for it and keep the combined thermal resistance within the manufacturer's limit.
Acclimatise and plan the layout
- Store the unopened packs flat in the room for about 48 hours before fitting, at normal room temperature.
- Lay the boards parallel to the main light source, or along the longest wall in narrow rooms.
- Measure the room width before starting so the last row isn't a thin sliver; adjust the width of the first row if needed.
- Stagger the end joints between rows by the minimum distance the manufacturer specifies, so the joints don't line up.
- Leave an expansion gap around the edges and at every fixed obstacle (pipes, door frames, thresholds). Its width is given in the instructions — it is hidden later by the skirting.
Skirting, transitions and doors
Skirting is bought by the running metre: the room perimeter minus the door openings, plus around 5% for joints and mitred corners. Large rooms or long corridors may need expansion profiles at intervals specified by the manufacturer, and doorways usually need a transition strip between rooms.
Check that doors will still open over the new floor plus underlay — trimming a door is easier before the floor is in.
Tools you will need
- Tape measure, pencil, square and a long straightedge
- Fine-toothed saw or laminate cutter, jigsaw for notches
- Tapping block, pull bar and a rubber mallet
- Spacers for the expansion gap
- Utility knife and tape for the underlay and vapour barrier
Frequently asked questions
Can laminate go on top of old tiles?
Often yes, if the tiles are firmly bonded and the floor is flat; deep grout lines may need filling. Check the added height at doors and thresholds.
Is laminate suitable for bathrooms?
Only products explicitly declared suitable for wet rooms. Standard laminate swells when water gets into the joints; click vinyl or tiles are usually the safer choice in bathrooms.
Calculators for this job
Laminate flooring calculator
How many packs of laminate or wood flooring to buy, plus underlay and skirting, rounded to whole packs.
Screed calculator
How many kilograms and bags of screed or self-levelling compound you need for a floor.
Renovation budget calculator
Add up the cost items from your quotes, reserve a contingency and compare the total with your available budget.